OiRA

Help Menu Messages 1 Help Dashboard
Help
  1. Preparation
  2. Involve
  3. Identification + Evaluation
    1. 1 Commercial manned guarding
      1. 1.1 Work environment (site related)
      2. 1.2 Fire prevention and emergency procedures
        1. 1.2.1 The guards know what to do in case of a fire alarm.
        2. 1.2.2 The guards know what to do in case of serious and imminent dangers.
    2. Ω Custom risks
    • Unanswered
    • Postponed
    • No risk
    • Risk identified
  4. Action Plan
  5. Consultancy
  6. Report
  7. Training
  8. Status
  9. Settings
  10. Exit
Help

The guards know what to do in case of serious and imminent dangers.

The tasks during a bomb threat or other serious & immediate dangers (e.g., gas leak, flooding, …) should be clear to all private security guards. This should be tested and exercised during regular drills.

The necessary measures must be taken and instructions given so that, in case of serious, immediate danger which cannot be avoided, private security guards may cease their activities and/or go to a safe place by immediately leaving their workplace.

Any worker faced with a serious and immediate danger to his or her safety and/or that of others in a situation in which it is impossible to contact the relevant superior, should be able to take suitable steps to prevent the consequences of such a danger.

Steigerklassen (volgens NBN EN 12811-1)

The following table is markup wise a plain vanilla table. The browser’s table rendering algorithm tries to establish the optimum distribution of cell widths. Nothing special is required other than plain table markup. A thead and tbody are required though whatever software creates this table should support these elements.

Notice the sticky effect on the table headers in supported browsers.

Klasse Volledig verdeelde belasting in kN/m² Aard werken
1 0,75 Controle, lichte werktuigen, zonder opslag van materialen
2 1,50 Geen opslag, onmiddellijk gebruik van materiaal, reinigingswerken
3 2,00 Idem als 2 maar met iets grotere belasting vb. Bepleisteren
4 3,00 Werkzaamheden met zware werktuigen (metsen)
5 4,50 Werkzaamheden met zeer zware werktuigen/ materialen (prefab elementen)
6 6,00 Zwaar metselwerk met opslag van materialen

The following table is has one extra element in the (`strong.label`) in each `thead > th` plus a class `diagonal-headers` on the table tag. A simple XSLT conversion could already do a lot here. Ideally the editor would have the choice which table to use within his (rich) editor.

Notice the roll over effect that reveals extra long table headers.

Klasse Volledig verdeelde belasting in kN/m² Aard werken
1 0,75 Controle, lichte werktuigen, zonder opslag van materialen
2 1,50 Geen opslag, onmiddellijk gebruik van materiaal, reinigingswerken
3 2,00 Idem als 2 maar met iets grotere belasting vb. Bepleisteren
4 3,00 Werkzaamheden met zware werktuigen (metsen)
5 4,50 Werkzaamheden met zeer zware werktuigen/ materialen (prefab elementen)
6 6,00 Zwaar metselwerk met opslag van materialen

The next example shows a table with multiple tbodies. The multiple tbodies are not strictly necessary for the layout. The `h4` tags and the `colspan` attributes are.

This table layout still allows the reader to compare relevant cells, without sacrificing too much horizontal space which is scarce on especially mobile phones in portrait mode. A fallback to automatic horizontal scrolling within the table could be implemented as an additional safety measure, should an editor include a table that is rather wide and not properly tested on all mobile devices.

This is fairly standard table markup. I only rearranged the furniture.

</tr> </tr> </tr> </tr>
Aard werken Volledig verdeelde belasting in kN/m²
Klasse 1
Controle, lichte werktuigen, zonder opslag van materialen 0,75
Klasse 2
Geen opslag, onmiddellijk gebruik van materiaal, reinigingswerken 1,50
Klasse 3
Idem als 2 maar met iets grotere belasting vb. Bepleisteren 2,00
Klasse 4
Werkzaamheden met zware werktuigen (metsen) 3,00
Klasse 5
Werkzaamheden met zeer zware werktuigen/ materialen (prefab elementen) 4,50
Klasse 6
Zwaar metselwerk met opslag van materialen 6,00

A combination of techniques:

</tr> </tr> </tr> </tr>
Volledig verdeelde belasting in kN/m² Aard werken
Klasse 1
0,75 Controle, lichte werktuigen, zonder opslag van materialen
Klasse 2
1,50 Geen opslag, onmiddellijk gebruik van materiaal, reinigingswerken
Klasse 3
2,00 Idem als 2 maar met iets grotere belasting vb. Bepleisteren
Klasse 4
3,00 Werkzaamheden met zware werktuigen (metsen)
Klasse 5
4,50 Werkzaamheden met zeer zware werktuigen/ materialen (prefab elementen)
Klasse 6
6,00 Zwaar metselwerk met opslag van materialen

Zurück Continue

Scroll to top

Open sidebar Close sidebar

Back

2014-01-14-the-guards-know-what-to-do-in-case-of-serious-and-imminent-dangers.md

More…
  • New risk assessment
Help

Reset Help

  • Show sibling tools